48TPH Bituminous Coal Grinding Plant in China
The production line adopts two-step pulverized coal preparation process. After the grinding machine was put into operation, the working efficiency is high and the finished powder is quality, and the fineness is small enough, which greatly exceeds the expectation of customers. In addition, the capacity has been greatly improved compared with the original grinding milling, so the customers are very satisfied.
Location: Gansu, China
Equipment: LM2200M Vertical Mill
Material: bituminous coal
Capacity: 45-48 T/H
Input Size: <30mm
Output size: 200 mesh, D90
Application: boiler pulverized coal