Online

WhatsApp

Message

Top

FA Q

What are the techniques of installing coarse powder mill?
Date:01/13/2017
Asker:Hogan
Ask Date:2016-12-22 16:26
Question:What are the techniques of installing coarse powder mill?
Detail:What are the techniques of installing coarse powder mill?

Reply:Hi Hogan. Thank you for your question.

The techniques of installing coarse powder mill are listed as follow.

1.Build the foundation of cement according to installation drawings, and cast-in situ concrete foundation is better. Besides, there should be a fifteen-day guarantee.

2.Pay attention to the position and size of anchor bolt. Control its height and then correct the upper plane by level.

3.Vibrating feeder must be installed which ensures the materials are fed continuously.

4.The empty machine should be running for 10 minutes.

5.Keep host stable when running. Ensure there is no abnormal noise. The temperature of bearing chamber must not be more than 50℃.

6.Stop machine after 30-minute commissioning and then tighten all fasteners.

7.Check the machine each week in case the bolts are loose and then cause losses.

8.The time of load running can’t be less than 8 hours.

Liming Heavy Industry (Shanghai)
  • Liming Heavy Industry launches a new product --- VU gravel aggregate system

  • Which is the best supplier of calcite ultrafine powder mill equipment?

Request a quote

  • Select model and place orders

    Select the model and submit the purchase intention

  • Get the base price

    Manufacturers take the initiative to contact and inform the lowest price

  • Plant inspection

    Expert training guide, regular return visit

  • Sign the contract

    Select the model and submit the purchase intention

Get the minimum offer free of charge, please fill in the following information to tell us

(confidential information, not open to the public)

*
*